A 54.4 MW Storage Asset

with Secured Grid Access.

A 54.406 MW / 202.240 MWh battery storage project in Tuturano, Brindisi, Puglia, connecting at 36 kV via a 1.8 km underground route to the 380/150 kV Brindisi Sud substation. Land secured, STMG accepted and PTO obtained; single authorisation forecast Q4 2026.